This bathroom was fully remodeled down to the studs. The existing bathtub was removed, and a small, enclosed shower was replaced with a large, custom curbless shower. The remodel features detailed precision tile work and a modern, open layout.
The project focused on creating a more functional space, incorporating custom shower design elements and high-quality finishes throughout.
Pasadena Craftsman
107 S. Fair Oaks Ave. Suite 326, Pasadena, CA 91105.
© Pasadena Craftsman General Contractor Since 2005 - All Rights Reserved.